Brice Highway LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: BRICE HIGHWAY LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Jul 1, 2025, retrieved Nov 24, 2026.

Proposals bid
10
Low bids (rank 1)
1
Win rate
10%
Low-bid value
$5.7M
Money left on table
$12K
Avg. bid vs. estimate
+21.28%

From Nov 6, 2024 to Jul 1, 2025, Brice Highway LLC submitted 10 bids on TxDOT proposals and was the apparent low bidder on 1 of them (10%), with low bids totalling $5,682,863. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $12,423 (0.22% of those bids); the median gap was 0.22%. On average its bids came in 21.28% above TxDOT's engineer's estimate. Its most frequent district was Houston (4 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024200.0%$0
20258112.5%$5,682,863

Head-to-head rivals

BidderProposals togetherRanked ahead
E-Z Bel Construction, LLC30 of 3
Forde Construction Company, Inc.33 of 3
Isi Contracting, Inc.31 of 3
Mc2 Civil, LLC30 of 3
R Construction Civil, LLC31 of 3
Ragle Construction, Inc.33 of 3
Ser Construction Partners, LLC30 of 3
Stx Civil30 of 3

Districts and work types

DistrictBids
Houston4
Beaumont2
Yoakum2
Lufkin1
San Antonio1
Work type of low bidsLow bids
Bridge Replacement1

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2025-07-010912-00-663HarrisPedestrian, Sidewalks & Curb Ramps5 of 8$1,124,883+18.7%-2.8%
2025-07-010913-09-127WhartonBridge Replacement7 of 7$3,615,073+29.6%+25.4%
2025-06-050920-02-097LibertyBridge Replacement1 of 3$5,682,863—+4.2%
2025-05-010553-03-034NacogdochesBridge Replacement8 of 8$9,773,672+56.9%+32.6%
2025-04-040110-04-224MontgomeryBridge Widening or Rehabilitation6 of 6$1,985,400+105.9%+59%
2025-04-041259-01-049MontgomeryCulvert & Storm Drainage Work3 of 8$3,694,692+5.7%-8%
2025-03-050521-04-293BexarPedestrian, Sidewalks & Curb Ramps6 of 6$4,404,057+53.3%+52%
2025-03-040913-09-123WhartonBridge Replacement9 of 9$4,862,850+56.9%+53.1%
2024-12-030271-15-099HarrisFreeway Operational Improvements4 of 11$4,408,972+11.6%-4.9%
2024-11-060028-03-111LibertyInterchange (New or Reconstructed)6 of 7$32,128,832+17.8%+2.3%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.