Artillery L.L.C.: TxDOT Bid Results and Margins

Name as published by TxDOT: ARTILLERY L.L.C. · Data as published by TxDOT, lettings Mar 5, 2025 to Aug 6, 2026, retrieved Nov 24, 2026.

Proposals bid
15
Low bids (rank 1)
1
Win rate
6.67%
Low-bid value
$662K
Money left on table
$19K
Avg. bid vs. estimate
+18.21%

From Mar 5, 2025 to Aug 6, 2026, Artillery L.L.C. submitted 15 bids on TxDOT proposals and was the apparent low bidder on 1 of them (6.67%), with low bids totalling $662,209. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $19,002 (2.87% of those bids); the median gap was 2.87%. On average its bids came in 18.21% above TxDOT's engineer's estimate. Its most frequent district was Pharr (11 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20251100.0%$0
20264125.0%$662,209

Head-to-head rivals

BidderProposals togetherRanked ahead
Lucania Contractors LLC82 of 8
Stx Civil73 of 7
Ti-Zack Concrete, LLC61 of 6
Icos Management, LLC52 of 5
Texas Cordia Construction, LLC53 of 5
3lw Civil LLC42 of 4
Castillo Aranda LLC41 of 4
Clore Equipment LLC42 of 4

Districts and work types

DistrictBids
Pharr11
Corpus Christi2
Houston1
Paris1
Work type of low bidsLow bids
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-04-040038-06-051StarrReim Construction, Inc.$1,458,980$1,478,530+1.3%
2025-07-020528-01-128HidalgoRhino Equity, LLC$1,093,924$1,131,092+3.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-08-061228-03-052HidalgoSafety Improvement Projects1 of 4$662,209—+2.1%
2026-07-020921-00-091HidalgoPedestrian, Sidewalks & Curb Ramps3 of 8$2,197,522+13.1%-8.6%
2026-06-030921-02-534HidalgoPedestrian, Sidewalks & Curb Ramps7 of 7$777,697+57.7%+73.7%
2026-05-070916-02-025KlebergBicycle Infrastructure Improvements7 of 8$1,840,850+57.1%+29%
2025-12-046494-02-001CameronRoutine Maintenance Project - Sealed6 of 6$650,732+69.6%+3.3%
2025-09-040039-02-077HidalgoSafety Improvement Projects5 of 9$875,550+19.2%-5.6%
2025-09-046356-68-001CameronBridge Preventative Maintenance - Sealed5 of 5$839,315+72.2%+41.9%
2025-08-080921-06-355CameronSafety Improvement Projects4 of 6$1,697,893+73.6%+26.9%
2025-08-070901-22-130HuntPedestrian, Sidewalks & Curb Ramps11 of 12$757,478+57.2%+39.7%
2025-08-070921-06-370CameronPedestrian, Sidewalks & Curb Ramps4 of 8$1,949,780+19.8%+1.2%
2025-07-020528-01-128HidalgoBridge Maintenance2 of 3$1,131,092+3.4%+64.8%
2025-07-010912-00-663HarrisPedestrian, Sidewalks & Curb Ramps6 of 8$1,316,025+38.8%+13.7%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.