A-1 Dot Solutions LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: A-1 DOT SOLUTIONS LLC · Data as published by TxDOT, lettings Nov 20, 2024 to Sep 17, 2025, retrieved Nov 24, 2026.
- Proposals bid
- 5
- Low bids (rank 1)
- 1
- Win rate
- 20%
- Low-bid value
- $141K
- Money left on table
- $19K
- Avg. bid vs. estimate
- +3.87%
From Nov 20, 2024 to Sep 17, 2025, A-1 Dot Solutions LLC submitted 5 bids on TxDOT proposals and was the apparent low bidder on 1 of them (20%), with low bids totalling $141,123. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $18,682 (13.24% of those bids); the median gap was 13.24%. On average its bids came in 3.87% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (2 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2024 | 2 | 0 | 0.0% | $0 |
| 2025 | 3 | 1 | 33.3% | $141,123 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Anahuac Infrastructure LLC | 2 | 1 of 2 |
| A. L. Helmcamp, Inc. | 1 | 0 of 1 |
| Aad Contracting Inc. | 1 | 0 of 1 |
| Above All Contracting LLC | 1 | 0 of 1 |
| Albeco Contractors LLC | 1 | 0 of 1 |
| American Infrastructure Maintenance Management LLC | 1 | 1 of 1 |
| Bk Field Operations LLC | 1 | 0 of 1 |
| Bootstraps Occupational Services Incorporated | 1 | 1 of 1 |
Districts and work types
| District | Bids |
|---|---|
| San Antonio | 2 |
| Atlanta | 1 |
| Pharr | 1 |
| Tyler | 1 |
| Work type of low bids | Low bids |
|---|---|
| Bridge Widening or Rehabilitation | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2025-09-17 | 6489-91-001 | Kerr | Routine Maintenance Project | 4 of 9 | $652,304 | +24.4% | -18.3% |
| 2025-01-21 | 6478-11-001 | Anderson | Routine Maintenance Project | 6 of 6 | $777,750 | +78.2% | +51.3% |
| 2025-01-08 | 0915-12-690 | Bexar | Bridge Widening or Rehabilitation | 1 of 4 | $141,123 | — | -21% |
| 2024-12-03 | 0621-01-118 | Hidalgo | Bridge Maintenance | 7 of 7 | $74,918 | +291.2% | +42.2% |
| 2024-11-20 | 6472-05-001 | Titus | Routine Maintenance Project | 4 of 5 | $269,870 | +44.7% | -34.8% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.