Above All Contracting LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: ABOVE ALL CONTRACTING LLC · Data as published by TxDOT, lettings Jan 14, 2025 to Nov 10, 2026, retrieved Nov 24, 2026.
Proposals bid
45
Low bids (rank 1)
8
Win rate
17.78%
Low-bid value
$1.5M
Money left on table
$406K
Avg. bid vs. estimate
-1.96%
From Jan 14, 2025 to Nov 10, 2026, Above All Contracting LLC submitted 45 bids on TxDOT proposals and was the apparent low bidder on 8 of them (17.78%), with low bids totalling $1,503,429. In 8 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $406,032 (27.01% of those bids); the median gap was 28.3%. On average its bids came in 1.96% below TxDOT's engineer's estimate. Its most frequent district was Houston (14 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.