Urban Infraconstruction LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: URBAN INFRACONSTRUCTION LLC · Data as published by TxDOT, lettings May 1, 2025 to Aug 6, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 20
- Low bids (rank 1)
- 2
- Win rate
- 10%
- Low-bid value
- $99.7M
- Money left on table
- $5.3M
- Avg. bid vs. estimate
- +13.46%
From May 1, 2025 to Aug 6, 2026, Urban Infraconstruction LLC submitted 20 bids on TxDOT proposals and was the apparent low bidder on 2 of them (10%), with low bids totalling $99,662,033. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $5,349,347 (5.37% of those bids); the median gap was 4.59%. On average its bids came in 13.46% above TxDOT's engineer's estimate. Its most frequent district was Dallas (5 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2025 | 16 | 0 | 0.0% | $0 |
| 2026 | 4 | 2 | 50.0% | $99,662,033 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 10 | 2 of 10 |
| C. E. Barker, Ltd. | 9 | 4 of 9 |
| Stx Civil | 8 | 0 of 8 |
| Knife River Corporation - South | 7 | 1 of 7 |
| Altus Construction LLC | 6 | 1 of 6 |
| Coppell Construction Co., Inc. | 6 | 3 of 6 |
| Grey Sky Construction LLC | 6 | 3 of 6 |
| Talbert Companies LLC | 6 | 0 of 6 |
Districts and work types
| District | Bids |
|---|---|
| Dallas | 5 |
| Fort Worth | 4 |
| San Antonio | 2 |
| Yoakum | 2 |
| Abilene | 1 |
| Work type of low bids | Low bids |
|---|---|
| Interchange (New or Reconstructed) | 1 |
| Widen Non-Freeway | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-08-06 | 0314-07-070 | Parker | Rehabilitation of Existing Road | 4 of 7 | $16,839,039 | +7.3% | -7.3% |
| 2026-06-02 | 0018-06-185 | Webb | Interchange (New or Reconstructed) | 1 of 6 | $69,850,000 | — | +4.5% |
| 2026-05-06 | 0073-08-183 | Bexar | Freeway Operational Improvements | 4 of 5 | $34,417,509 | +3.9% | +0.3% |
| 2026-02-04 | 1015-01-024 | Rockwall | Widen Non-Freeway | 1 of 12 | $29,812,034 | — | -13.9% |
| 2025-09-05 | 1747-02-017 | Stonewall | Bridge Replacement | 4 of 10 | $4,626,000 | +19.1% | -44% |
| 2025-08-07 | 0211-07-046 | Lee | Bridge Replacement | 3 of 10 | $14,375,000 | +8.7% | -2.7% |
| 2025-07-02 | 0918-22-162 | Ellis | Bridge Replacement | 9 of 10 | $3,248,850 | +28.3% | +10.9% |
| 2025-07-02 | 2134-01-031 | Robertson | Rehabilitation of Existing Road | 6 of 7 | $24,831,509 | +36.6% | -1.2% |
| 2025-07-01 | 0267-02-043 | Fayette | Bridge Replacement | 10 of 10 | $5,996,900 | +40% | +47.8% |
| 2025-07-01 | 0918-22-159 | Ellis | Bridge Replacement | 11 of 13 | $3,835,000 | +22.8% | +11.5% |
| 2025-06-05 | 0902-49-072 | Erath | Bridge Replacement | 9 of 9 | $1,300,000 | +50% | +23.1% |
| 2025-06-05 | 0925-10-037 | Donley | Bridge Replacement | 9 of 10 | $1,355,000 | +41.9% | +32.1% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.