Urban Infraconstruction LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: URBAN INFRACONSTRUCTION LLC · Data as published by TxDOT, lettings May 1, 2025 to Aug 6, 2026, retrieved Nov 24, 2026.

Proposals bid
20
Low bids (rank 1)
2
Win rate
10%
Low-bid value
$99.7M
Money left on table
$5.3M
Avg. bid vs. estimate
+13.46%

From May 1, 2025 to Aug 6, 2026, Urban Infraconstruction LLC submitted 20 bids on TxDOT proposals and was the apparent low bidder on 2 of them (10%), with low bids totalling $99,662,033. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $5,349,347 (5.37% of those bids); the median gap was 4.59%. On average its bids came in 13.46% above TxDOT's engineer's estimate. Its most frequent district was Dallas (5 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20251600.0%$0
20264250.0%$99,662,033

Head-to-head rivals

BidderProposals togetherRanked ahead
Hodges and Son Construction Company, Inc.102 of 10
C. E. Barker, Ltd.94 of 9
Stx Civil80 of 8
Knife River Corporation - South71 of 7
Altus Construction LLC61 of 6
Coppell Construction Co., Inc.63 of 6
Grey Sky Construction LLC63 of 6
Talbert Companies LLC60 of 6

Districts and work types

DistrictBids
Dallas5
Fort Worth4
San Antonio2
Yoakum2
Abilene1
Work type of low bidsLow bids
Interchange (New or Reconstructed)1
Widen Non-Freeway1

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-08-060314-07-070ParkerRehabilitation of Existing Road4 of 7$16,839,039+7.3%-7.3%
2026-06-020018-06-185WebbInterchange (New or Reconstructed)1 of 6$69,850,000—+4.5%
2026-05-060073-08-183BexarFreeway Operational Improvements4 of 5$34,417,509+3.9%+0.3%
2026-02-041015-01-024RockwallWiden Non-Freeway1 of 12$29,812,034—-13.9%
2025-09-051747-02-017StonewallBridge Replacement4 of 10$4,626,000+19.1%-44%
2025-08-070211-07-046LeeBridge Replacement3 of 10$14,375,000+8.7%-2.7%
2025-07-020918-22-162EllisBridge Replacement9 of 10$3,248,850+28.3%+10.9%
2025-07-022134-01-031RobertsonRehabilitation of Existing Road6 of 7$24,831,509+36.6%-1.2%
2025-07-010267-02-043FayetteBridge Replacement10 of 10$5,996,900+40%+47.8%
2025-07-010918-22-159EllisBridge Replacement11 of 13$3,835,000+22.8%+11.5%
2025-06-050902-49-072ErathBridge Replacement9 of 9$1,300,000+50%+23.1%
2025-06-050925-10-037DonleyBridge Replacement9 of 10$1,355,000+41.9%+32.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.