Reynolds Asphalt & Construction Company: TxDOT Bid Results and Margins
Name as published by TxDOT: REYNOLDS ASPHALT & CONSTRUCTION COMPANY · Data as published by TxDOT, lettings Feb 6, 2025 to Aug 20, 2026, retrieved Nov 24, 2026.
Proposals bid
12
Low bids (rank 1)
1
Win rate
8.33%
Low-bid value
$558K
Money left on table
$56K
Avg. bid vs. estimate
+5.02%
From Feb 6, 2025 to Aug 20, 2026, Reynolds Asphalt & Construction Company submitted 12 bids on TxDOT proposals and was the apparent low bidder on 1 of them (8.33%), with low bids totalling $558,250. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $55,750 (9.99% of those bids); the median gap was 9.99%. On average its bids came in 5.02% above TxDOT's engineer's estimate. Its most frequent district was Fort Worth (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.