C-Rae Materials LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: C-RAE MATERIALS LLC · Data as published by TxDOT, lettings Apr 16, 2026 to Oct 22, 2026, retrieved Nov 24, 2026.

Proposals bid
14
Low bids (rank 1)
6
Win rate
42.86%
Low-bid value
$3.1M
Money left on table
$100K
Avg. bid vs. estimate
-6.77%

From Apr 16, 2026 to Oct 22, 2026, C-Rae Materials LLC submitted 14 bids on TxDOT proposals and was the apparent low bidder on 6 of them (42.86%), with low bids totalling $3,149,225. In 6 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $100,345 (3.19% of those bids); the median gap was 3.22%. On average its bids came in 6.77% below TxDOT's engineer's estimate. Its most frequent district was Paris (9 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202614642.9%$3,149,225

Head-to-head rivals

BidderProposals togetherRanked ahead
Rk Hall, LLC146 of 14
Reynolds Asphalt & Construction Company44 of 4
Longview Asphalt, Inc.33 of 3
Roadxchange Melissa LLC22 of 2
Texas Materials Group, Inc.22 of 2
Austin Asphalt, Inc.11 of 1
Overland Materials & Manufacturing, Inc.11 of 1

Districts and work types

DistrictBids
Paris9
Atlanta5
Work type of low bidsLow bids
Material Maintenance Project5
Material Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-04-166499-98-001RainsRk Hall, LLC$609,315$654,780+7.5%
2026-04-166500-13-001HuntRk Hall, LLC$617,190$687,540+11.4%
2026-04-166500-12-001HopkinsRk Hall, LLC$627,760$701,400+11.7%
2026-04-166500-00-001FranklinRk Hall, LLC$689,440$780,240+13.2%
2026-04-166499-97-001FanninRk Hall, LLC$697,240$816,360+17.1%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-10-226509-82-001MorrisMaterial Maintenance Project1 of 2$311,000—-18.8%
2026-10-226509-85-001CassMaterial Maintenance Project1 of 2$311,000—-23.5%
2026-10-226509-87-001TitusMaterial Maintenance Project1 of 2$310,000—-18.8%
2026-10-226509-88-001BowieMaterial Maintenance Project1 of 2$306,000—-23.4%
2026-10-226509-89-001BowieMaterial Maintenance Project1 of 2$306,000—-23.3%
2026-05-076500-99-001LamarMaterial Maintenance Project - Sealed1 of 2$1,605,225—+1%
2026-04-166499-97-001FanninMaterial Maintenance Project - Sealed2 of 5$816,360+17.1%+9.3%
2026-04-166499-98-001RainsMaterial Maintenance Project - Sealed2 of 4$654,780+7.5%+2.8%
2026-04-166500-00-001FranklinMaterial Maintenance Project - Sealed2 of 3$780,240+13.2%-1.5%
2026-04-166500-01-001Red RiverMaterial Maintenance Project - Sealed2 of 2$658,580+19.7%-0.1%
2026-04-166500-03-001LamarMaterial Maintenance Project - Sealed2 of 2$725,500+20.3%+0.7%
2026-04-166500-11-001DeltaMaterial Maintenance Project - Sealed2 of 3$725,500+20.3%+0.7%