Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Mb Western Industrial Contracting Co.: TxDOT Bid Results and Margins

Name as published by TxDOT: MB WESTERN INDUSTRIAL CONTRACTING CO. · Data as published by TxDOT, lettings Nov 6, 2024 to Mar 5, 2026, retrieved Nov 24, 2026.

Proposals bid
50
Low bids (rank 1)
1
Win rate
2%
Low-bid value
$90K
Money left on table
$40K
Avg. bid vs. estimate
+9.93%

From Nov 6, 2024 to Mar 5, 2026, Mb Western Industrial Contracting Co. submitted 50 bids on TxDOT proposals and was the apparent low bidder on 1 of them (2%), with low bids totalling $89,848. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $40,035 (44.56% of those bids); the median gap was 44.56%. On average its bids came in 9.93% above TxDOT's engineer's estimate. Its most frequent district was Houston (9 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024800.0%$0
20253612.8%$89,848
2026600.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Built Right Construction of Oklahoma, LLC1612 of 16
Garret Shields Infrastructure163 of 16
Scr Civil Construction, LLC157 of 15
Structural Integrity Group LLC154 of 15
Icos Management, LLC148 of 14
Ragle Construction, Inc.113 of 11
Bk Field Operations LLC90 of 9
Grey Sky Construction LLC97 of 9

Districts and work types

DistrictBids
Houston9
Beaumont7
Austin5
Bryan5
Yoakum5
Work type of low bidsLow bids
Pedestrian, Sidewalks & Curb Ramps1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2024-12-030912-72-747HarrisIsi Contracting, Inc.$2,588,189$2,814,792+8.8%
2025-01-070185-03-036MilamYoko Excavating, LLC$1,409,595$1,582,582+12.3%
2025-04-030920-00-138JeffersonRhino Equity, LLC$198,960$228,565+14.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-03-050932-02-059JeffersonSafety Improvement Projects3 of 3$1,958,236+72.6%+51.4%
2026-03-040100-08-106BeeSafety Improvement Projects7 of 7$2,903,068+84.9%+66%
2026-02-040913-00-128De WittBridge Maintenance10 of 12$3,234,384+38%+39.2%
2026-01-060050-11-027GrimesBridge Maintenance5 of 8$3,426,495+20.7%+31.8%
2026-01-060271-16-153HarrisBridge Maintenance7 of 7$4,707,067+51.3%+45.3%
2026-01-061302-01-028WhartonRehabilitation of Existing Road7 of 7$3,148,997+65.9%+62.2%
2025-07-020617-02-079NuecesBridge Maintenance4 of 7$2,480,961+41%-5.5%
2025-07-010028-02-108HarrisSafety Improvement Projects6 of 8$3,806,624+31.3%+10.3%
2025-07-010028-07-059JeffersonBridge Maintenance5 of 9$7,370,558+42.6%-1.2%
2025-07-010917-29-148BrazosPedestrian, Sidewalks & Curb Ramps1 of 4$89,848—-10.7%
2025-05-136479-24-001WallerBridge Preventative Maintenance - Sealed4 of 6$863,000+11.1%+6.2%
2025-05-066464-83-001GonzalesBridge Preventative Maintenance - Sealed5 of 5$569,925+46.7%-1.3%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.