Martin Resource Management Corporation: TxDOT Bid Results and Margins
Name as published by TxDOT: MARTIN RESOURCE MANAGEMENT CORPORATION · Data as published by TxDOT, lettings Jan 7, 2025 to Oct 13, 2026, retrieved Nov 24, 2026.
Proposals bid
32
Low bids (rank 1)
9
Win rate
28.13%
Low-bid value
$2M
Money left on table
$101K
Avg. bid vs. estimate
+0.1%
From Jan 7, 2025 to Oct 13, 2026, Martin Resource Management Corporation submitted 32 bids on TxDOT proposals and was the apparent low bidder on 9 of them (28.13%), with low bids totalling $1,964,120. In 9 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $100,899 (5.14% of those bids); the median gap was 5.09%. On average its bids came in 0.1% above TxDOT's engineer's estimate. Its most frequent district was Bryan (10 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.