Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

M&d Construction Services: TxDOT Bid Results and Margins

Name as published by TxDOT: M&D CONSTRUCTION SERVICES · Data as published by TxDOT, lettings Nov 13, 2025 to Jan 13, 2026, retrieved Nov 24, 2026.

Proposals bid
6
Low bids (rank 1)
1
Win rate
16.67%
Low-bid value
$112K
Money left on table
$361.59
Avg. bid vs. estimate
-1.52%

From Nov 13, 2025 to Jan 13, 2026, M&d Construction Services submitted 6 bids on TxDOT proposals and was the apparent low bidder on 1 of them (16.67%), with low bids totalling $111,514. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $362 (0.32% of those bids); the median gap was 0.32%. On average its bids came in 1.52% below TxDOT's engineer's estimate. Its most frequent district was Bryan (6 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025400.0%$0
20262150.0%$111,514

Head-to-head rivals

BidderProposals togetherRanked ahead
Touchstone Resources, LLC30 of 3
A. L. Helmcamp, Inc.20 of 2
Colorado Materials, Ltd.22 of 2
Gv Landscape and Construction LLC22 of 2
Knife River Corporation - South21 of 2
Martin Marietta Materials, Inc.22 of 2
Ortega's Lawn and Landscaping, LLC21 of 2
Premier Contractors LLC22 of 2

Districts and work types

DistrictBids
Bryan6
Work type of low bidsLow bids
Routine Maintenance Project1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-12-106492-80-001RobertsonJackson Excavation, LLC$94,750$100,000+5.5%
2025-11-136491-69-001WashingtonTouchstone Resources, LLC$100,000$110,990+11%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-01-136495-41-001WashingtonRoutine Maintenance Project4 of 5$108,675+19.3%+6.5%
2026-01-136495-51-001BrazosRoutine Maintenance Project1 of 6$111,514—-20.1%
2025-12-106492-80-001RobertsonRoutine Maintenance Project2 of 5$100,000+5.5%-20.9%
2025-12-096493-43-001WalkerMaterial Maintenance Project4 of 6$145,000+8.8%-4.6%
2025-11-136491-69-001WashingtonMaterial Maintenance Project2 of 7$110,990+11%-0%
2025-11-136491-71-001BrazosMaterial Maintenance Project4 of 5$348,975+31.9%+30%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.