Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Jr West Texas Concrete LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: JR WEST TEXAS CONCRETE LLC · Data as published by TxDOT, lettings Sep 2, 2026 to Nov 12, 2026, retrieved Nov 24, 2026.

Proposals bid
6
Low bids (rank 1)
0
Win rate
0%
Low-bid value
$0.000
Money left on table
—
Avg. bid vs. estimate
+41.33%

From Sep 2, 2026 to Nov 12, 2026, Jr West Texas Concrete LLC submitted 6 bids on TxDOT proposals and was the apparent low bidder on 0 of them (0%), with low bids totalling $0. On average its bids came in 41.33% above TxDOT's engineer's estimate. Its most frequent district was Dallas (4 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2026600.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Tucan Contracting, LLC31 of 3
Ed Bell Construction Company20 of 2
Garret Shields Infrastructure20 of 2
Gibson & Associates, Inc.20 of 2
Icos Management, LLC20 of 2
Premier Contractors LLC20 of 2
Ragle Construction, Inc.21 of 2
Yoko Excavating, LLC20 of 2

Districts and work types

DistrictBids
Dallas4
Bryan1
Wichita Falls1

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-126497-55-001DentonBridge Preventative Maintenance - Sealed6 of 6$746,209+51.3%+41.2%
2026-11-126506-91-001NavarroRoutine Maintenance Project - Sealed6 of 6$592,590+134.3%+85.6%
2026-10-070092-03-064EllisSafety Improvement Projects4 of 8$4,442,440+18.1%-2%
2026-10-070196-03-288DallasPedestrian, Sidewalks & Curb Ramps9 of 9$1,553,329+31.9%+22%
2026-10-060590-05-057MilamPedestrian, Sidewalks & Curb Ramps9 of 10$475,070+84.5%+101.5%
2026-09-020043-17-036WichitaPedestrian, Sidewalks & Curb Ramps4 of 7$1,184,640+14.9%-0.3%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.