Hawk Construction: TxDOT Bid Results and Margins
Name as published by TxDOT: HAWK CONSTRUCTION · Data as published by TxDOT, lettings Oct 14, 2025 to Aug 5, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 10
- Low bids (rank 1)
- 1
- Win rate
- 10%
- Low-bid value
- $1.5M
- Money left on table
- $415K
- Avg. bid vs. estimate
- +25.44%
From Oct 14, 2025 to Aug 5, 2026, Hawk Construction submitted 10 bids on TxDOT proposals and was the apparent low bidder on 1 of them (10%), with low bids totalling $1,469,600. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $414,717 (28.22% of those bids); the median gap was 28.22%. On average its bids came in 25.44% above TxDOT's engineer's estimate. Its most frequent district was El Paso (10 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2025 | 4 | 1 | 25.0% | $1,469,600 |
| 2026 | 6 | 0 | 0.0% | $0 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Synergy Project Contractors, Inc. | 8 | 1 of 8 |
| International Eagle Enterprises, Inc. | 7 | 3 of 7 |
| Premier Contractors LLC | 3 | 0 of 3 |
| Dan Williams Company | 2 | 0 of 2 |
| Horizone Construction I, Ltd | 2 | 0 of 2 |
| Icos Management, LLC | 2 | 1 of 2 |
| O. Trevino Construction, LLC | 2 | 0 of 2 |
| Scr Civil Construction, LLC | 2 | 0 of 2 |
Districts and work types
| District | Bids |
|---|---|
| El Paso | 10 |
| Work type of low bids | Low bids |
|---|---|
| Routine Maintenance Project | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-08-05 | 6504-80-001 | El Paso | Routine Maintenance Project | 5 of 6 | $2,555,000 | +44.2% | +5.1% |
| 2026-06-02 | 0924-00-162 | El Paso | Bridge Maintenance | 3 of 6 | $1,075,146 | +32.3% | +39.8% |
| 2026-05-07 | 0167-02-092 | El Paso | Safety Improvement Projects | 3 of 3 | $3,319,132 | +33.9% | +10.5% |
| 2026-05-05 | 6498-81-001 | El Paso | Routine Maintenance Project | 3 of 3 | $2,315,950 | +40.3% | +131.9% |
| 2026-04-08 | 0674-01-083 | El Paso | Pedestrian, Sidewalks & Curb Ramps | 5 of 6 | $1,580,000 | +26.5% | +20.8% |
| 2026-03-04 | 6493-40-001 | El Paso | Bridge Preventative Maintenance | 9 of 10 | $1,684,407 | +64.3% | +30.5% |
| 2025-12-11 | 6489-59-001 | El Paso | Routine Maintenance Project | 3 of 3 | $879,870 | +1.1% | -4.2% |
| 2025-12-09 | 6463-91-001 | El Paso | Bridge Preventative Maintenance - Sealed | 5 of 7 | $857,041 | +54.2% | -0.5% |
| 2025-12-03 | 6489-56-001 | El Paso | Routine Maintenance Project | 1 of 3 | $1,469,600 | — | -3.2% |
| 2025-10-14 | 6484-69-001 | El Paso | Routine Maintenance Project | 3 of 3 | $1,229,875 | +42.4% | +23.6% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.