Harper Brothers Construction LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: HARPER BROTHERS CONSTRUCTION LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
25
Low bids (rank 1)
2
Win rate
8%
Low-bid value
$93.5M
Money left on table
$4.9M
Avg. bid vs. estimate
-2.14%

From Nov 6, 2024 to Nov 4, 2026, Harper Brothers Construction LLC submitted 25 bids on TxDOT proposals and was the apparent low bidder on 2 of them (8%), with low bids totalling $93,542,393. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $4,929,793 (5.27% of those bids); the median gap was 0.94%. On average its bids came in 2.14% below TxDOT's engineer's estimate. Its most frequent district was Dallas (9 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024200.0%$0
2025600.0%$0
202617211.8%$93,542,393

Head-to-head rivals

BidderProposals togetherRanked ahead
James Construction Group, LLC114 of 11
Webber, LLC116 of 11
Indus Road & Bridge, Inc.93 of 9
Pulice Construction, Inc.96 of 9
Ragle Construction, Inc.95 of 9
Granite Construction Company88 of 8
R Construction Civil, LLC74 of 7
Ser Construction Partners, LLC73 of 7

Districts and work types

DistrictBids
Dallas9
Houston7
Austin4
Fort Worth2
San Antonio1
Work type of low bidsLow bids
New Location Non-Freeway1
Rehabilitation of Existing Road1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-08-053510-04-070Fort BendJames Construction Group, LLC$25,954,400$26,217,697+1%
2026-08-050014-15-034TarrantIndus Road & Bridge, Inc.$66,140,142$66,949,776+1.2%
2025-05-010113-13-195TravisJordan Foster Construction, LLC$6,242,242$7,395,332+18.5%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040047-04-032CollinWiden Non-Freeway4 of 4$40,441,503+13.1%+1.3%
2026-11-030015-13-432TravisWiden Freeway4 of 6$477,550,553+15.8%+16.5%
2026-08-063510-04-069Fort BendNew Location Non-Freeway5 of 9$34,996,279+7.1%-17.4%
2026-08-050014-15-034TarrantIntersection & Operational Imprv2 of 11$66,949,776+1.2%-9.9%
2026-08-050027-08-147Fort BendWiden Non-Freeway4 of 7$50,296,882+3%-4.2%
2026-08-053510-04-070Fort BendNew Location Non-Freeway2 of 8$26,217,697+1%-17.3%
2026-07-010014-03-088JohnsonInterchange (New or Reconstructed)4 of 6$69,798,708+8.4%-2%
2026-07-013510-04-066Fort BendNew Location Non-Freeway1 of 11$19,505,918—-3%
2026-06-020196-07-034DallasBridge Widening or Rehabilitation4 of 6$106,159,593+13.1%-2%
2026-06-020912-72-846HarrisPedestrian, Sidewalks & Curb Ramps5 of 7$6,857,738+57.7%+3.6%
2026-04-083510-05-047HarrisWiden Freeway9 of 10$143,791,907+19.9%+5.7%
2026-03-040261-01-041EllisInterchange (New or Reconstructed)3 of 9$66,338,016+4.1%+4%