Earthworks Enterprise: TxDOT Bid Results and Margins

Name as published by TxDOT: EARTHWORKS ENTERPRISE · Data as published by TxDOT, lettings May 1, 2025 to Aug 5, 2026, retrieved Nov 24, 2026.

Proposals bid
12
Low bids (rank 1)
2
Win rate
16.67%
Low-bid value
$2.6M
Money left on table
$636K
Avg. bid vs. estimate
+3.04%

From May 1, 2025 to Aug 5, 2026, Earthworks Enterprise submitted 12 bids on TxDOT proposals and was the apparent low bidder on 2 of them (16.67%), with low bids totalling $2,605,403. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $636,326 (24.42% of those bids); the median gap was 7.73%. On average its bids came in 3.04% above TxDOT's engineer's estimate. Its most frequent district was Pharr (12 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20255240.0%$2,605,403
2026700.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Foremost Paving, Inc.95 of 9
Ioc Company LLC81 of 8
Texas Cordia Construction, LLC63 of 6
Artillery L.L.C.43 of 4
Lucania Contractors LLC42 of 4
Castillo Aranda LLC30 of 3
Ck Newberry, LLC32 of 3
Clore Equipment LLC32 of 3

Districts and work types

DistrictBids
Pharr12
Work type of low bidsLow bids
Pedestrian, Sidewalks & Curb Ramps1
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-04-081426-01-058CameronIoc Company LLC$7,826,503$8,324,953+6.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-08-050921-02-525HidalgoSafety Improvement Projects4 of 4$1,183,472+56.3%+41.9%
2026-08-051586-01-085HidalgoRehabilitation of Existing Road4 of 7$6,720,781+5.4%+1.9%
2026-07-020921-00-091HidalgoPedestrian, Sidewalks & Curb Ramps4 of 8$2,230,825+14.8%-7.2%
2026-06-036491-09-001HidalgoRoutine Maintenance Project3 of 3$7,107,494+14.7%+4.2%
2026-06-020861-01-071HidalgoSafety Improvement Projects6 of 7$9,286,974+21%+8%
2026-04-081426-01-058CameronOverlay2 of 5$8,324,953+6.4%+15%
2026-01-070038-07-080StarrOverlay3 of 3$2,797,786+17.9%-1.5%
2025-12-046494-02-001CameronRoutine Maintenance Project - Sealed5 of 6$647,092+68.7%+2.7%
2025-08-080921-06-355CameronSafety Improvement Projects1 of 6$978,047—-26.9%
2025-08-070921-06-370CameronPedestrian, Sidewalks & Curb Ramps1 of 8$1,627,355—-15.5%
2025-07-011427-02-008HidalgoSafety Improvement Projects5 of 6$4,225,053+24%+3.8%
2025-05-010255-07-152HidalgoOverlay4 of 4$8,662,912+35%+10.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.