Name as published by TxDOT: DOUBLE A CONTRACTING, L.P. · Data as published by TxDOT, lettings Feb 6, 2025 to Nov 2, 2026, retrieved Nov 24, 2026.

Proposals bid
30
Low bids (rank 1)
2
Win rate
6.67%
Low-bid value
$3.6M
Money left on table
$324K
Avg. bid vs. estimate
-11.87%

From Feb 6, 2025 to Nov 2, 2026, Double A Contracting, L.P. submitted 30 bids on TxDOT proposals and was the apparent low bidder on 2 of them (6.67%), with low bids totalling $3,556,833. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $323,676 (9.1% of those bids); the median gap was 1.27%. On average its bids came in 11.87% below TxDOT's engineer's estimate. Its most frequent district was Odessa (7 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20251100.0%$0
202619210.5%$3,556,833

Head-to-head rivals

BidderProposals togetherRanked ahead
Trp Infrastructure Services, LLC1810 of 18
L&l Company142 of 14
Stripe-A-Zone, LLC127 of 12
Centerline Technologies, LLC93 of 9
Pavement Markings Inc.76 of 7
Stripe Lines, Inc.77 of 7
Striping Technology, L.P.63 of 6
Abescape Group LLC50 of 5

Districts and work types

DistrictBids
Odessa7
Bryan4
Abilene3
Waco3
Brownwood2
Work type of low bidsLow bids
Routine Maintenance Project2

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-02-060905-00-123LubbockL&l Company$7,105,938$7,158,385+0.7%
2026-07-010114-09-103WashingtonL&l Company$667,088$675,603+1.3%
2025-03-050209-06-043HillCenterline Technologies, LLC$926,962$948,681+2.3%
2026-06-046497-64-001El PasoPmi Pavement Marking, LLC$500,077$512,371+2.5%
2026-07-166499-24-001SterlingDesert Luxury Transportation, LLC$237,103$245,880+3.7%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-026494-86-001BrownRoutine Maintenance Project4 of 5$698,190+24.3%-25.6%
2026-10-066496-56-001BrownRoutine Maintenance Project1 of 7$3,276,697—-25.8%
2026-09-156499-40-001CraneRoutine Maintenance Project2 of 6$288,012+18%-3.4%
2026-09-156505-47-001UptonRoutine Maintenance Project1 of 5$280,136—+3.1%
2026-08-066500-92-001CoryellRoutine Maintenance Project3 of 5$2,697,989+9.2%-23%
2026-07-166499-24-001SterlingRoutine Maintenance Project2 of 4$245,880+3.7%+7.9%
2026-07-020057-03-052FreestoneTraffic Control Devices3 of 7$1,502,379+15.5%-9.7%
2026-07-020311-01-019DonleySafety Improvement Projects4 of 5$914,151+22.4%-42.2%
2026-07-026502-50-001BrazosRoutine Maintenance Project3 of 8$1,264,350+25.4%-46.4%
2026-07-010114-09-103WashingtonTraffic Control Devices2 of 8$675,603+1.3%-17.2%
2026-07-010117-01-062BrazosTraffic Control Devices4 of 8$946,677+10.4%-10.8%
2026-06-046497-64-001El PasoRoutine Maintenance Project2 of 2$512,371+2.5%+1.9%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.