Name as published by TxDOT: AWP SAFETY · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 5, 2026, retrieved Nov 24, 2026.
Proposals bid
61
Low bids (rank 1)
24
Win rate
39.34%
Low-bid value
$26.6M
Money left on table
$2.9M
Avg. bid vs. estimate
+15.62%
From Nov 6, 2024 to Nov 5, 2026, Awp Safety submitted 61 bids on TxDOT proposals and was the apparent low bidder on 24 of them (39.34%), with low bids totalling $26,584,478. In 19 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $2,924,321 (14.1% of those bids); the median gap was 11.65%. On average its bids came in 15.62% above TxDOT's engineer's estimate. Its most frequent district was Dallas (12 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.