Acee Construction LLC.: TxDOT Bid Results and Margins

Name as published by TxDOT: ACEE CONSTRUCTION LLC. · Data as published by TxDOT, lettings Apr 3, 2025 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
7
Low bids (rank 1)
3
Win rate
42.86%
Low-bid value
$4.2M
Money left on table
$884K
Avg. bid vs. estimate
+0.84%

From Apr 3, 2025 to Nov 4, 2026, Acee Construction LLC. submitted 7 bids on TxDOT proposals and was the apparent low bidder on 3 of them (42.86%), with low bids totalling $4,163,054. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $884,221 (21.24% of those bids); the median gap was 23.3%. On average its bids came in 0.84% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (3 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202522100.0%$2,640,039
20265120.0%$1,523,016

Head-to-head rivals

BidderProposals togetherRanked ahead
Stx Civil62 of 6
E-Z Bel Construction, LLC43 of 4
Ck Newberry, LLC31 of 3
Garret Shields Infrastructure32 of 3
Hunter Industries, Ltd.32 of 3
J. Carroll Weaver, Inc.32 of 3
Acme Bridge Company, Inc.22 of 2
J E Construction Services, LLC20 of 2

Districts and work types

DistrictBids
San Antonio3
Corpus Christi2
Laredo2
Work type of low bidsLow bids
Bridge Replacement1
Culvert & Storm Drainage Work1
Pedestrian, Sidewalks & Curb Ramps1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-06-030291-03-077KerrStx Civil$4,297,620$4,711,431+9.6%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040922-33-234WebbBridge Replacement3 of 7$3,033,273+5.8%+18.4%
2026-08-060254-01-149Live OakRehabilitation of Existing Road8 of 8$15,590,772+60.6%+48.2%
2026-06-030291-03-077KerrPedestrian, Sidewalks & Curb Ramps2 of 6$4,711,431+9.6%+5.6%
2026-04-070922-48-004ZavalaBridge Replacement1 of 5$1,523,016—-6.7%
2026-02-050101-04-130San PatricioBridge Replacement9 of 12$2,282,403+25.9%+19.6%
2025-06-041741-01-013AtascosaPedestrian, Sidewalks & Curb Ramps1 of 7$1,236,296—-35.1%
2025-04-030142-04-052KerrCulvert & Storm Drainage Work1 of 7$1,403,742—-44.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.