Williams Brothers Construction Co., Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: WILLIAMS BROTHERS CONSTRUCTION CO., INC. · Data as published by TxDOT, lettings Jun 5, 2025 to Aug 5, 2026, retrieved Nov 24, 2026.
Proposals bid
6
Low bids (rank 1)
3
Win rate
50%
Low-bid value
$629M
Money left on table
$89.1M
Avg. bid vs. estimate
-20.22%
From Jun 5, 2025 to Aug 5, 2026, Williams Brothers Construction Co., Inc. submitted 6 bids on TxDOT proposals and was the apparent low bidder on 3 of them (50%), with low bids totalling $628,952,702. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $89,143,581 (14.17% of those bids); the median gap was 9.3%. On average its bids came in 20.22% below TxDOT's engineer's estimate. Its most frequent district was San Antonio (3 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.