Waller County Asphalt Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: WALLER COUNTY ASPHALT INC. · Data as published by TxDOT, lettings Dec 4, 2024 to Oct 13, 2026, retrieved Nov 24, 2026.
Proposals bid
11
Low bids (rank 1)
10
Win rate
90.91%
Low-bid value
$1.7M
Money left on table
$147K
Avg. bid vs. estimate
-7.53%
From Dec 4, 2024 to Oct 13, 2026, Waller County Asphalt Inc. submitted 11 bids on TxDOT proposals and was the apparent low bidder on 10 of them (90.91%), with low bids totalling $1,664,629. In 4 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $147,488 (23.63% of those bids); the median gap was 25.6%. On average its bids came in 7.53% below TxDOT's engineer's estimate. Its most frequent district was Maintenance Division (3 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.