Name as published by TxDOT: UMD Construction · Data as published by TxDOT, lettings Jun 10, 2025 to Dec 29, 2025, retrieved Nov 24, 2026.
Proposals bid
18
Low bids (rank 1)
5
Win rate
27.78%
Low-bid value
$1.7M
Money left on table
$385K
Avg. bid vs. estimate
+2.76%
From Jun 10, 2025 to Dec 29, 2025, Umd Construction submitted 18 bids on TxDOT proposals and was the apparent low bidder on 5 of them (27.78%), with low bids totalling $1,665,536. In 5 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $384,884 (23.11% of those bids); the median gap was 22.75%. On average its bids came in 2.76% above TxDOT's engineer's estimate. Its most frequent district was Waco (4 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.