Texas Road LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: TEXAS ROAD LLC · Data as published by TxDOT, lettings Apr 3, 2025 to Jul 2, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 6
- Low bids (rank 1)
- 2
- Win rate
- 33.33%
- Low-bid value
- $15.7M
- Money left on table
- $8.8M
- Avg. bid vs. estimate
- -6.46%
From Apr 3, 2025 to Jul 2, 2026, Texas Road LLC submitted 6 bids on TxDOT proposals and was the apparent low bidder on 2 of them (33.33%), with low bids totalling $15,684,238. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $8,811,609 (56.18% of those bids); the median gap was 12.27%. On average its bids came in 6.46% below TxDOT's engineer's estimate. Its most frequent district was Austin (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2025 | 4 | 1 | 25.0% | $7,905,116 |
| 2026 | 2 | 1 | 50.0% | $7,779,122 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Aaron Concrete Contractors, LLC | 4 | 3 of 4 |
| Dan Williams Company | 4 | 2 of 4 |
| Joe Bland Construction LLC | 4 | 2 of 4 |
| Jordan Foster Construction, LLC | 3 | 2 of 3 |
| Chasco Constructors | 2 | 0 of 2 |
| E-Z Bel Construction, LLC | 2 | 2 of 2 |
| Hunter Industries, Ltd. | 2 | 0 of 2 |
| Posillico Civil, Inc. | 2 | 0 of 2 |
Districts and work types
| District | Bids |
|---|---|
| Austin | 6 |
| Work type of low bids | Low bids |
|---|---|
| Safety Improvement Projects | 1 |
| Transportation Non-Roadway | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-07-02 | 0914-04-377 | Travis | Transportation Non-Roadway | 1 of 6 | $7,779,122 | — | -52.3% |
| 2026-06-03 | 0337-01-053 | Williamson | Intersection & Operational Imprv | 3 of 6 | $8,304,002 | +9.6% | +13.3% |
| 2025-11-05 | 0273-04-045 | Williamson | Intersection & Operational Imprv | 8 of 8 | $16,484,001 | +12.6% | -15.8% |
| 2025-08-08 | 0323-01-028 | Bastrop | Intersection & Operational Imprv | 3 of 6 | $21,358,537 | +13.4% | +25% |
| 2025-06-05 | 3486-01-010 | Williamson | Widen Non-Freeway | 4 of 8 | $5,235,504 | +12.3% | +0.9% |
| 2025-04-03 | 1378-01-050 | Travis | Safety Improvement Projects | 1 of 5 | $7,905,116 | — | -9.8% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.