Superior Traffic Control, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: SUPERIOR TRAFFIC CONTROL, LLC · Data as published by TxDOT, lettings Nov 26, 2024 to Mar 10, 2026, retrieved Nov 24, 2026.

Proposals bid
8
Low bids (rank 1)
2
Win rate
25%
Low-bid value
$602K
Money left on table
$32K
Avg. bid vs. estimate
+16.92%

From Nov 26, 2024 to Mar 10, 2026, Superior Traffic Control, LLC submitted 8 bids on TxDOT proposals and was the apparent low bidder on 2 of them (25%), with low bids totalling $601,605. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $31,895 (5.3% of those bids); the median gap was 3.51%. On average its bids came in 16.92% above TxDOT's engineer's estimate. Its most frequent district was Houston (4 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
20255240.0%$601,605
2026200.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Awp Safety75 of 7
Blue Chip Services, LLC40 of 4
Barricades Unlimited31 of 3
Republic Traffic Safety, Inc.31 of 3
Batterson, Llp22 of 2
Professional Traffic Control LLC20 of 2
Centerline Supply, Inc.10 of 1
Centerline Technologies, LLC10 of 1

Districts and work types

DistrictBids
Houston4
Dallas3
Maintenance Division1
Work type of low bidsLow bids
Routine Maintenance Project - Sealed2

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-12-036493-15-001DallasAwp Safety$825,825$922,005+11.7%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-03-106493-77-001HarrisRoutine Maintenance Project - Sealed5 of 7$944,010+20%+5.8%
2026-03-106494-28-001MontgomeryRoutine Maintenance Project - Sealed5 of 7$401,230+50.1%+36.5%
2025-12-036493-15-001DallasRoutine Maintenance Project2 of 3$922,005+11.6%-27%
2025-11-126476-10-001HarrisRoutine Maintenance Project - Sealed4 of 6$1,567,145+147.2%+102.2%
2025-11-126487-32-001CollinRoutine Maintenance Project - Sealed1 of 2$352,230—+12.3%
2025-11-126489-87-001DallasRoutine Maintenance Project - Sealed1 of 2$249,375—-15.6%
2025-10-096488-73-001HendersonMaterial Only Traffic3 of 3$7,900,756+95.4%-11.1%
2024-11-266473-49-001WallerRoutine Maintenance Project - Sealed4 of 4$843,550+48.7%+32.3%