Sema Construction, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: SEMA CONSTRUCTION, INC. · Data as published by TxDOT, lettings Jan 8, 2025 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
8
Low bids (rank 1)
1
Win rate
12.5%
Low-bid value
$218M
Money left on table
$3.4M
Avg. bid vs. estimate
-10.27%

From Jan 8, 2025 to Nov 4, 2026, Sema Construction, Inc. submitted 8 bids on TxDOT proposals and was the apparent low bidder on 1 of them (12.5%), with low bids totalling $217,964,539. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,405,580 (1.56% of those bids); the median gap was 1.56%. On average its bids came in 10.27% below TxDOT's engineer's estimate. Its most frequent district was Dallas (5 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20252150.0%$217,964,539
2026600.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Webber, LLC82 of 8
Mario Sinacola & Sons Excavating, Inc.62 of 6
Rpm Xconstruction, LLC63 of 6
Indus Road & Bridge, Inc.51 of 5
Zachry Construction Corporation54 of 5
Austin Bridge & Road Services, LP44 of 4
Pulice Construction, Inc.33 of 3
Granite Construction Company20 of 2

Districts and work types

DistrictBids
Dallas5
Fort Worth1
Lubbock1
Paris1
Work type of low bidsLow bids
Interchange (New or Reconstructed)1

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040195-02-092DentonWiden Freeway5 of 6$154,136,028+11.6%+6.8%
2026-08-050014-15-034TarrantIntersection & Operational Imprv3 of 11$67,334,856+1.8%-9.4%
2026-07-021502-01-031LubbockConvert Non-Freeway To Freeway3 of 5$269,724,854+21.7%-9.1%
2026-05-060081-03-047DentonWiden Non-Freeway3 of 9$113,483,925+1.9%+1.7%
2026-04-070047-03-091GraysonWiden Freeway5 of 6$140,442,227+12%-86.6%
2026-03-040261-01-041EllisInterchange (New or Reconstructed)8 of 9$74,989,385+17.7%+17.6%
2025-08-070195-02-081DentonWiden Freeway5 of 9$149,681,673+16.3%-10.7%
2025-01-080196-02-126DentonInterchange (New or Reconstructed)1 of 4$217,964,539—+7.5%