Rucoba & Maya Construction, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: Rucoba & Maya Construction, LLC · Data as published by TxDOT, lettings Feb 5, 2026 to Nov 4, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 9
- Low bids (rank 1)
- 3
- Win rate
- 33.33%
- Low-bid value
- $10.4M
- Money left on table
- $416K
- Avg. bid vs. estimate
- +14.31%
From Feb 5, 2026 to Nov 4, 2026, Rucoba & Maya Construction, LLC submitted 9 bids on TxDOT proposals and was the apparent low bidder on 3 of them (33.33%), with low bids totalling $10,420,902. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $416,086 (3.99% of those bids); the median gap was 3.87%. On average its bids came in 14.31% above TxDOT's engineer's estimate. Its most frequent district was Yoakum (4 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2026 | 9 | 3 | 33.3% | $10,420,902 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Stx Civil | 9 | 5 of 9 |
| E-Z Bel Construction, LLC | 6 | 3 of 6 |
| Texas Steel Industrial Placing, LLC | 6 | 2 of 6 |
| Hodges and Son Construction Company, Inc. | 4 | 1 of 4 |
| Joe Bland Construction LLC | 4 | 3 of 4 |
| Presidio Contracting, LLC | 4 | 1 of 4 |
| Trevway, Inc. | 4 | 1 of 4 |
| Castillo Aranda LLC | 3 | 2 of 3 |
Districts and work types
| District | Bids |
|---|---|
| Yoakum | 4 |
| Austin | 2 |
| Bryan | 1 |
| San Antonio | 1 |
| Waco | 1 |
| Work type of low bids | Low bids |
|---|---|
| Bridge Replacement | 1 |
| Pedestrian, Sidewalks & Curb Ramps | 1 |
| Rehabilitation of Existing Road | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0285-03-066 | Hays | Pedestrian, Sidewalks & Curb Ramps | 3 of 9 | $1,103,755 | +16.1% | +17.5% |
| 2026-11-03 | 0917-30-068 | Burleson | Bridge Replacement | 13 of 15 | $954,437 | +32.2% | +34% |
| 2026-09-02 | 0913-09-134 | Wharton | Bridge Replacement | 1 of 12 | $2,677,071 | — | +14.2% |
| 2026-08-06 | 3534-01-021 | Bell | Pedestrian, Sidewalks & Curb Ramps | 1 of 8 | $4,094,515 | — | -8.3% |
| 2026-08-05 | 0913-28-101 | Fayette | Bridge Replacement | 5 of 9 | $1,988,206 | +22.9% | +16.3% |
| 2026-07-02 | 0266-04-053 | Colorado | Safety Improvement Projects | 5 of 9 | $6,413,924 | +34.2% | +23.3% |
| 2026-07-01 | 0211-10-053 | Colorado | Pedestrian, Sidewalks & Curb Ramps | 8 of 10 | $1,869,911 | +14.7% | +7.4% |
| 2026-05-07 | 1271-01-013 | Wilson | Bridge Replacement | 17 of 17 | $1,659,957 | +74.9% | +38% |
| 2026-02-05 | 1201-02-026 | Williamson | Rehabilitation of Existing Road | 1 of 10 | $3,649,316 | — | -13.6% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.