Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Roman Emperors Road, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: ROMAN EMPERORS ROAD, LLC · Data as published by TxDOT, lettings Dec 3, 2024 to Sep 3, 2026, retrieved Nov 24, 2026.

Proposals bid
13
Low bids (rank 1)
1
Win rate
7.69%
Low-bid value
$3.5M
Money left on table
$156K
Avg. bid vs. estimate
+3.18%

From Dec 3, 2024 to Sep 3, 2026, Roman Emperors Road, LLC submitted 13 bids on TxDOT proposals and was the apparent low bidder on 1 of them (7.69%), with low bids totalling $3,494,495. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $156,267 (4.47% of those bids); the median gap was 4.47%. On average its bids came in 3.18% above TxDOT's engineer's estimate. Its most frequent district was Houston (9 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024200.0%$0
20254125.0%$3,494,495
2026700.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Mc2 Civil, LLC70 of 7
Forde Construction Company, Inc.52 of 5
Texas Materials Group, Inc.51 of 5
Castillo Aranda LLC41 of 4
Environmental Allies, Inc.30 of 3
Grey Sky Construction LLC32 of 3
Jfo Services, LLC30 of 3
Mbn Enterprises LLC30 of 3

Districts and work types

DistrictBids
Houston9
Abilene1
San Antonio1
Tyler1
Yoakum1
Work type of low bidsLow bids
Culvert & Storm Drainage Work1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-01-070975-02-023JonesJ. H. Strain & Sons, Inc.$2,611,155$2,859,244+9.5%
2025-02-070271-07-352HarrisMc2 Civil, LLC$926,322$1,143,050+23.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-09-030051-09-127GalvestonPedestrian, Sidewalks & Curb Ramps5 of 7$2,520,515+20.8%+15.6%
2026-09-031479-01-028BexarSafety Improvement Projects6 of 6$4,988,339+44.8%+22.9%
2026-07-020675-08-121MontgomeryCulvert & Storm Drainage Work4 of 4$12,931,515+59.7%+15.7%
2026-03-043256-01-122HarrisPedestrian, Sidewalks & Curb Ramps9 of 9$3,371,155+64.5%-10.8%
2026-01-070975-02-023JonesSafety Improvement Projects2 of 5$2,859,244+9.5%+4.1%
2026-01-071986-01-073MontgomeryCulvert & Storm Drainage Work8 of 12$2,681,228+20.8%-2.9%
2026-01-060190-03-089WoodSafety Improvement Projects5 of 8$4,733,397+16.6%+15.4%
2025-12-030265-14-018FayettePedestrian, Sidewalks & Curb Ramps12 of 12$5,580,083+38.6%+11%
2025-12-020912-73-224GalvestonPedestrian, Sidewalks & Curb Ramps4 of 4$3,594,518+36.1%+9.7%
2025-04-041259-01-049MontgomeryCulvert & Storm Drainage Work1 of 8$3,494,495—-13%
2025-02-070271-07-352HarrisFreeway Operational Improvements2 of 3$1,143,050+23.4%-18.8%
2024-12-030114-12-017HarrisTransportation Non-Roadway5 of 6$1,796,593+17.9%-6.7%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.