Pulice Construction, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: PULICE CONSTRUCTION, INC. · Data as published by TxDOT, lettings Nov 7, 2024 to Nov 3, 2026, retrieved Nov 24, 2026.
Proposals bid
33
Low bids (rank 1)
2
Win rate
6.06%
Low-bid value
$373.6M
Money left on table
$15.8M
Avg. bid vs. estimate
-5.25%
From Nov 7, 2024 to Nov 3, 2026, Pulice Construction, Inc. submitted 33 bids on TxDOT proposals and was the apparent low bidder on 2 of them (6.06%), with low bids totalling $373,555,102. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $15,840,046 (4.24% of those bids); the median gap was 2.74%. On average its bids came in 5.25% below TxDOT's engineer's estimate. Its most frequent district was Houston (5 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.