Orion Construction, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: ORION CONSTRUCTION, LLC · Data as published by TxDOT, lettings Jan 8, 2025 to May 7, 2026, retrieved Nov 24, 2026.
Proposals bid
10
Low bids (rank 1)
2
Win rate
20%
Low-bid value
$120.3M
Money left on table
$2.7M
Avg. bid vs. estimate
+10.5%
From Jan 8, 2025 to May 7, 2026, Orion Construction, LLC submitted 10 bids on TxDOT proposals and was the apparent low bidder on 2 of them (20%), with low bids totalling $120,338,136. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $2,737,383 (2.27% of those bids); the median gap was 1.52%. On average its bids came in 10.5% above TxDOT's engineer's estimate. Its most frequent district was Waco (4 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.