Nobles Road Construction, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: NOBLES ROAD CONSTRUCTION, INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 6
- Low bids (rank 1)
- 1
- Win rate
- 16.67%
- Low-bid value
- $7.9M
- Money left on table
- $655K
- Avg. bid vs. estimate
- -3.05%
From Nov 6, 2024 to Nov 4, 2026, Nobles Road Construction, Inc. submitted 6 bids on TxDOT proposals and was the apparent low bidder on 1 of them (16.67%), with low bids totalling $7,895,450. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $654,870 (8.29% of those bids); the median gap was 8.29%. On average its bids came in 3.05% below TxDOT's engineer's estimate. Its most frequent district was Abilene (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2024 | 1 | 1 | 100.0% | $7,895,450 |
| 2025 | 4 | 0 | 0.0% | $0 |
| 2026 | 1 | 0 | 0.0% | $0 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Ck Newberry, LLC | 5 | 3 of 5 |
| Rk Hall, LLC | 5 | 0 of 5 |
| A. L. Helmcamp, Inc. | 4 | 2 of 4 |
| Reece Albert, Inc. | 4 | 3 of 4 |
| Zack Burkett Co. | 3 | 0 of 3 |
| J. H. Strain & Sons, Inc. | 2 | 1 of 2 |
| Bontke Brothers Construction Company | 1 | 1 of 1 |
| Duininck, Inc. | 1 | 0 of 1 |
Districts and work types
| District | Bids |
|---|---|
| Abilene | 6 |
| Work type of low bids | Low bids |
|---|---|
| Widen Non-Freeway | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0157-04-058 | Haskell | Overlay | 5 of 9 | $8,307,427 | +23.4% | +10.5% |
| 2025-10-08 | 0317-02-017 | Fisher | Overlay | 6 of 7 | $3,541,708 | +22.2% | -0.8% |
| 2025-06-05 | 0693-02-016 | Mitchell | Rehabilitation of Existing Road | 6 of 6 | $8,185,544 | +36.5% | +9.5% |
| 2025-03-18 | 6481-45-001 | Howard | Material Maintenance Project | 3 of 3 | $727,325 | +8.2% | -0.5% |
| 2025-02-07 | 0053-08-079 | Scurry | Overlay | 3 of 5 | $9,597,630 | +14.4% | -12.5% |
| 2024-11-06 | 2033-01-013 | Nolan | Widen Non-Freeway | 1 of 5 | $7,895,450 | — | -24.5% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.