Lumin8 Transportation Technologies, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: Lumin8 Transportation Technologies, LLC · Data as published by TxDOT, lettings Jun 4, 2025 to Nov 3, 2026, retrieved Nov 24, 2026.

Proposals bid
18
Low bids (rank 1)
1
Win rate
5.56%
Low-bid value
$822K
Money left on table
—
Avg. bid vs. estimate
+26.75%

From Jun 4, 2025 to Nov 3, 2026, Lumin8 Transportation Technologies, LLC submitted 18 bids on TxDOT proposals and was the apparent low bidder on 1 of them (5.56%), with low bids totalling $822,148. On average its bids came in 26.75% above TxDOT's engineer's estimate. Its most frequent district was Austin (6 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20258112.5%$822,148
20261000.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Elecnor Belco Electric, Inc.111 of 11
Sice, Inc.80 of 8
E-Z Bel Construction, LLC70 of 7
Florida Traffic Control Devices, Inc.72 of 7
Highway Intelligent Traffic Solutions, LLC60 of 6
The Levy Company, LLC61 of 6
Light It Up Electric50 of 5
Mica Corporation41 of 4

Districts and work types

DistrictBids
Austin6
Dallas6
San Antonio3
Fort Worth2
Waco1
Work type of low bidsLow bids
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-09-040918-00-490DallasAmerican Lighting and Signalization, LLC$4,816,126$4,946,888+2.7%
2025-06-186482-91-001BexarE-Z Bel Construction, LLC$345,325$543,515+57.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-030619-03-068CollinTraffic Control Devices9 of 13$2,102,052+37.5%+21.1%
2026-09-030047-06-178CollinCorridor Traffic Management7 of 7$3,231,256+13.8%+2.9%
2026-08-060025-02-234BexarCorridor Traffic Management6 of 7$9,493,084+20.1%-8.8%
2026-08-066487-45-001HaysRoutine Maintenance Project - Sealed5 of 5$3,706,640+87.6%+112.4%
2026-08-050902-90-286TarrantSafety Improvement Projects4 of 5$628,857+26.3%+11.5%
2026-07-020009-11-269DallasSafety Improvement Projects5 of 5$6,622,168+41.2%+16.7%
2026-07-020902-90-112TarrantTraffic Control Devices6 of 6$5,263,462+65.4%+25.7%
2026-05-070914-05-250WilliamsonSafety Improvement Projects6 of 6$632,821+66.9%+24%
2026-04-080216-01-062ComalSafety Improvement Projects10 of 10$1,313,299+60.9%+27%
2026-01-070914-00-520TravisTraffic Control Devices5 of 5$1,565,357+58.7%+89.6%
2025-09-040918-00-490DallasTraffic Control Devices2 of 4$4,946,888+2.7%+2.7%
2025-08-136468-22-001TravisRoutine Maintenance Project - Sealed1 of 1$822,148—-7.5%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.