J3 Company, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: J3 COMPANY, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Oct 7, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 10
- Low bids (rank 1)
- 1
- Win rate
- 10%
- Low-bid value
- $12M
- Money left on table
- $1.4M
- Avg. bid vs. estimate
- +7.8%
From Nov 6, 2024 to Oct 7, 2026, J3 Company, LLC submitted 10 bids on TxDOT proposals and was the apparent low bidder on 1 of them (10%), with low bids totalling $12,034,296. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,406,451 (11.69% of those bids); the median gap was 11.69%. On average its bids came in 7.8% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (10 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2024 | 1 | 0 | 0.0% | $0 |
| 2025 | 1 | 0 | 0.0% | $0 |
| 2026 | 8 | 1 | 12.5% | $12,034,296 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Hunter Industries, Ltd. | 8 | 2 of 8 |
| E-Z Bel Construction, LLC | 7 | 4 of 7 |
| Dean Word Company, Ltd. | 4 | 3 of 4 |
| Stx Civil | 4 | 3 of 4 |
| Capital Excavation Company | 3 | 2 of 3 |
| Joe Bland Construction LLC | 3 | 1 of 3 |
| Texas Materials Group, Inc. | 3 | 1 of 3 |
| Anderson Columbia Co., Inc. | 2 | 1 of 2 |
Districts and work types
| District | Bids |
|---|---|
| San Antonio | 10 |
| Work type of low bids | Low bids |
|---|---|
| Safety Improvement Projects | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-10-07 | 0143-03-049 | Wilson | Widen Non-Freeway | 8 of 8 | $52,863,113 | +32.6% | +4.9% |
| 2026-09-02 | 0915-11-037 | Kendall | Bridge Replacement | 5 of 8 | $820,372 | +24.5% | +56.6% |
| 2026-08-06 | 0535-02-050 | Guadalupe | Bridge Replacement | 3 of 8 | $6,294,204 | +9.4% | +10.4% |
| 2026-07-01 | 0016-05-128 | Comal | Safety Improvement Projects | 1 of 7 | $12,034,296 | — | -17.1% |
| 2026-06-03 | 0291-03-077 | Kerr | Pedestrian, Sidewalks & Curb Ramps | 5 of 6 | $6,126,351 | +42.6% | +37.3% |
| 2026-06-02 | 0216-03-034 | Guadalupe | Intersection & Operational Imprv | 3 of 7 | $3,089,270 | +13.2% | +3.6% |
| 2026-05-06 | 0073-08-183 | Bexar | Freeway Operational Improvements | 5 of 5 | $35,211,397 | +6.3% | +2.6% |
| 2026-03-04 | 2883-01-004 | Medina | Rehabilitation of Existing Road | 8 of 9 | $14,542,659 | +23.5% | -10.2% |
| 2025-02-06 | 0748-04-042 | Frio | Rehabilitation of Existing Road | 6 of 6 | $19,280,786 | +30.1% | -8% |
| 2024-11-06 | 0017-05-096 | Medina | Bridge Replacement | 3 of 7 | $14,399,556 | +12.3% | -2.1% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.