J3 Company, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: J3 COMPANY, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Oct 7, 2026, retrieved Nov 24, 2026.

Proposals bid
10
Low bids (rank 1)
1
Win rate
10%
Low-bid value
$12M
Money left on table
$1.4M
Avg. bid vs. estimate
+7.8%

From Nov 6, 2024 to Oct 7, 2026, J3 Company, LLC submitted 10 bids on TxDOT proposals and was the apparent low bidder on 1 of them (10%), with low bids totalling $12,034,296. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,406,451 (11.69% of those bids); the median gap was 11.69%. On average its bids came in 7.8% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (10 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
2025100.0%$0
20268112.5%$12,034,296

Head-to-head rivals

BidderProposals togetherRanked ahead
Hunter Industries, Ltd.82 of 8
E-Z Bel Construction, LLC74 of 7
Dean Word Company, Ltd.43 of 4
Stx Civil43 of 4
Capital Excavation Company32 of 3
Joe Bland Construction LLC31 of 3
Texas Materials Group, Inc.31 of 3
Anderson Columbia Co., Inc.21 of 2

Districts and work types

DistrictBids
San Antonio10
Work type of low bidsLow bids
Safety Improvement Projects1

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-10-070143-03-049WilsonWiden Non-Freeway8 of 8$52,863,113+32.6%+4.9%
2026-09-020915-11-037KendallBridge Replacement5 of 8$820,372+24.5%+56.6%
2026-08-060535-02-050GuadalupeBridge Replacement3 of 8$6,294,204+9.4%+10.4%
2026-07-010016-05-128ComalSafety Improvement Projects1 of 7$12,034,296—-17.1%
2026-06-030291-03-077KerrPedestrian, Sidewalks & Curb Ramps5 of 6$6,126,351+42.6%+37.3%
2026-06-020216-03-034GuadalupeIntersection & Operational Imprv3 of 7$3,089,270+13.2%+3.6%
2026-05-060073-08-183BexarFreeway Operational Improvements5 of 5$35,211,397+6.3%+2.6%
2026-03-042883-01-004MedinaRehabilitation of Existing Road8 of 9$14,542,659+23.5%-10.2%
2025-02-060748-04-042FrioRehabilitation of Existing Road6 of 6$19,280,786+30.1%-8%
2024-11-060017-05-096MedinaBridge Replacement3 of 7$14,399,556+12.3%-2.1%