Proposals bid
6
Low bids (rank 1)
3
Win rate
50%
Low-bid value
$3.4M
Money left on table
—
Avg. bid vs. estimate
+11.47%
From Jun 4, 2025 to May 7, 2026, Horizone Construction I, Ltd submitted 6 bids on TxDOT proposals and was the apparent low bidder on 3 of them (50%), with low bids totalling $3,350,191. On average its bids came in 11.47% above TxDOT's engineer's estimate. Its most frequent district was El Paso (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.