H. L. Zumwalt Construction, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: H. L. ZUMWALT CONSTRUCTION, INC. · Data as published by TxDOT, lettings Jan 7, 2026 to Jul 1, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 7
- Low bids (rank 1)
- 1
- Win rate
- 14.29%
- Low-bid value
- $1.1M
- Money left on table
- $77K
- Avg. bid vs. estimate
- +1.15%
From Jan 7, 2026 to Jul 1, 2026, H. L. Zumwalt Construction, Inc. submitted 7 bids on TxDOT proposals and was the apparent low bidder on 1 of them (14.29%), with low bids totalling $1,105,677. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $76,612 (6.93% of those bids); the median gap was 6.93%. On average its bids came in 1.15% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (7 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2026 | 7 | 1 | 14.3% | $1,105,677 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Clark Construction of Texas, Inc. | 7 | 2 of 7 |
| Hunter Industries, Ltd. | 7 | 3 of 7 |
| Lone Star Paving Company | 7 | 6 of 7 |
| Texas Materials Group, Inc. | 7 | 1 of 7 |
| Bobcat Services, Inc. | 4 | 1 of 4 |
| Dean Word Company, Ltd. | 4 | 3 of 4 |
| Allen Keller Company | 3 | 1 of 3 |
| Anderson Columbia Co., Inc. | 2 | 2 of 2 |
Districts and work types
| District | Bids |
|---|---|
| San Antonio | 7 |
| Work type of low bids | Low bids |
|---|---|
| Overlay | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-07-01 | 0143-01-068 | Bexar | Overlay | 7 of 8 | $2,942,152 | +27.1% | +14.4% |
| 2026-05-07 | 0073-02-092 | Bexar | Overlay | 1 of 7 | $1,105,677 | — | -13.5% |
| 2026-05-06 | 0915-00-313 | Bexar | Restoration | 4 of 5 | $6,141,372 | +38.7% | -0.1% |
| 2026-03-05 | 3544-04-011 | Bexar | Overlay | 3 of 8 | $2,686,776 | +7.6% | -18.3% |
| 2026-03-04 | 0421-02-034 | Medina | Overlay | 6 of 11 | $1,887,865 | +23.8% | -5.2% |
| 2026-01-07 | 6494-40-001 | Bexar | Routine Maintenance Project - Sealed | 5 of 5 | $2,024,023 | +30.1% | +24.7% |
| 2026-01-07 | 6494-43-001 | Frio | Routine Maintenance Project - Sealed | 3 of 6 | $2,097,983 | +7.2% | +5.9% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.