Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Apache Barricade & Sign: TxDOT Bid Results and Margins

Name as published by TxDOT: APACHE BARRICADE & SIGN · Data as published by TxDOT, lettings Dec 4, 2024 to Aug 12, 2026, retrieved Nov 24, 2026.

Proposals bid
18
Low bids (rank 1)
3
Win rate
16.67%
Low-bid value
$3.1M
Money left on table
$723K
Avg. bid vs. estimate
+13.15%

From Dec 4, 2024 to Aug 12, 2026, Apache Barricade & Sign submitted 18 bids on TxDOT proposals and was the apparent low bidder on 3 of them (16.67%), with low bids totalling $3,124,270. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $723,205 (153.29% of those bids); the median gap was 153.29%. On average its bids came in 13.15% above TxDOT's engineer's estimate. Its most frequent district was El Paso (12 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
20259222.2%$2,652,475
20268112.5%$471,795

Head-to-head rivals

BidderProposals togetherRanked ahead
Barricades Unlimited50 of 5
Ross Sa Enterprise LLC50 of 5
E.V.G. Enterprise40 of 4
Hjc Farms, Inc.43 of 4
Synergy Project Contractors, Inc.44 of 4
Austin Barricade Company, L.L.C.30 of 3
Dan Williams Company33 of 3
B & Ms Construction, Inc.21 of 2

Districts and work types

DistrictBids
El Paso12
Lubbock3
Odessa2
San Angelo1
Work type of low bidsLow bids
Routine Maintenance Project2
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-01-076491-63-001PresidioE.V.G. Enterprise$1,198,026$1,199,359+0.1%
2026-08-126500-72-001CulbersonE.V.G. Enterprise$1,106,900$1,148,925+3.8%
2026-04-216498-21-001MidlandHjc Farms, Inc.$398,390$415,525+4.3%
2025-12-046489-58-001El PasoBarricades Unlimited$667,040$719,870+7.9%
2025-11-126489-40-001El PasoBarricades Unlimited$667,850$733,213+9.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-08-126500-72-001CulbersonRoutine Maintenance Project2 of 3$1,148,925+3.8%+15%
2026-05-126501-97-001EctorRoutine Maintenance Project2 of 3$294,925+12.6%+7.7%
2026-04-286500-98-001LubbockRoutine Maintenance Project - Sealed3 of 3$772,075+114.9%+22.5%
2026-04-216498-21-001MidlandRoutine Maintenance Project2 of 2$415,525+4.3%+24.3%
2026-04-166474-39-001KimbleRoutine Maintenance Project4 of 4$844,533+109.5%+61.5%
2026-04-096495-55-001HudspethRoutine Maintenance Project1 of 2$471,795—-10.3%
2026-03-050924-00-160El PasoTransportation Non-Roadway2 of 6$360,137+12.4%-3.7%
2026-01-076491-63-001PresidioRoutine Maintenance Project - Sealed2 of 4$1,199,359+0.1%-31.9%
2025-12-046489-58-001El PasoRoutine Maintenance Project2 of 2$719,870+7.9%-23.8%
2025-12-046491-50-001TerryRoutine Maintenance Project - Sealed6 of 7$482,300+84.1%-4.8%
2025-12-046491-52-001LubbockRoutine Maintenance Project - Sealed7 of 7$1,207,900+220.8%+37.7%
2025-11-126489-40-001El PasoRoutine Maintenance Project2 of 2$733,213+9.8%-19.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.