American Infrastructure Maintenance Management LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC · Data as published by TxDOT, lettings Aug 13, 2025 to Jul 8, 2026, retrieved Nov 24, 2026.

Proposals bid
14
Low bids (rank 1)
1
Win rate
7.14%
Low-bid value
$431K
Money left on table
$649K
Avg. bid vs. estimate
+50.45%

From Aug 13, 2025 to Jul 8, 2026, American Infrastructure Maintenance Management LLC submitted 14 bids on TxDOT proposals and was the apparent low bidder on 1 of them (7.14%), with low bids totalling $430,875. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $648,625 (150.54% of those bids); the median gap was 150.54%. On average its bids came in 50.45% above TxDOT's engineer's estimate. Its most frequent district was Brownwood (2 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20258112.5%$430,875
2026600.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure40 of 4
Structural Integrity Group LLC42 of 4
2h, LLC31 of 3
Good News Ranch and Farm LLC32 of 3
Gv Landscape and Construction LLC33 of 3
Hazmat International, Inc.30 of 3
Rare Earth Landscape Solutions LLC30 of 3
Rhino Equity, LLC30 of 3

Districts and work types

DistrictBids
Brownwood2
Corpus Christi2
San Antonio2
Tyler2
Beaumont1
Work type of low bidsLow bids
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-07-076498-40-001RuskMarlane Construction, LLC$187,162$212,242+13.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-07-086494-10-001WhartonBridge Preventative Maintenance - Sealed6 of 9$232,276+51.9%+0.3%
2026-07-076498-40-001RuskRoutine Maintenance Project2 of 6$212,242+13.4%-2%
2026-07-076498-43-001WoodRoutine Maintenance Project4 of 6$225,399+25.7%-1.9%
2026-06-020916-00-263NuecesBridge Maintenance9 of 14$263,530+48.4%+19.2%
2026-01-070916-00-289NuecesPort Infrastructure5 of 6$60,000+143.2%+77.2%
2026-01-060920-00-163JeffersonTraffic Control Devices6 of 12$284,893+17.8%+44.5%
2025-12-186490-64-001GraysonRoutine Maintenance Project - Sealed4 of 4$613,500+61.9%+67.4%
2025-12-176493-66-001TarrantRoutine Maintenance Project - Sealed9 of 9$409,654+126.5%+79.3%
2025-10-156490-79-001ShelbyRoutine Maintenance Project3 of 5$792,000+11.2%-4.9%
2025-09-176489-75-001MedinaRoutine Maintenance Project11 of 11$1,446,120+145.1%+71.7%
2025-09-176489-91-001KerrRoutine Maintenance Project9 of 9$1,190,624+127.1%+49.2%
2025-09-040182-01-022EastlandSafety Improvement Projects10 of 10$249,800+497.8%+130.3%