Albatross Construction LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: ALBATROSS CONSTRUCTION LLC · Data as published by TxDOT, lettings Sep 4, 2025 to Aug 6, 2026, retrieved Nov 24, 2026.
Proposals bid
10
Low bids (rank 1)
3
Win rate
30%
Low-bid value
$13M
Money left on table
$911K
Avg. bid vs. estimate
-19.17%
From Sep 4, 2025 to Aug 6, 2026, Albatross Construction LLC submitted 10 bids on TxDOT proposals and was the apparent low bidder on 3 of them (30%), with low bids totalling $13,029,715. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $910,802 (6.99% of those bids); the median gap was 5.46%. On average its bids came in 19.17% below TxDOT's engineer's estimate. Its most frequent district was Houston (4 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.