Name as published by TxDOT: A M FABRICATION INC. · Data as published by TxDOT, lettings Jan 15, 2025 to Nov 17, 2026, retrieved Nov 24, 2026.
Proposals bid
36
Low bids (rank 1)
2
Win rate
5.56%
Low-bid value
$513K
Money left on table
$47K
Avg. bid vs. estimate
+21.94%
From Jan 15, 2025 to Nov 17, 2026, A M Fabrication Inc. submitted 36 bids on TxDOT proposals and was the apparent low bidder on 2 of them (5.56%), with low bids totalling $513,492. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $46,941 (14.21% of those bids); the median gap was 14.21%. On average its bids came in 21.94% above TxDOT's engineer's estimate. Its most frequent district was Amarillo (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.