Proposals bid
6
Low bids (rank 1)
0
Win rate
0%
Low-bid value
$0.000
Money left on table
—
Avg. bid vs. estimate
+7.81%

From Apr 8, 2025 to Nov 12, 2025, Southwest Envirotx Partners, LLC submitted 6 bids on TxDOT proposals and was the apparent low bidder on 0 of them (0%), with low bids totalling $0. On average its bids came in 7.81% above TxDOT's engineer's estimate. Its most frequent district was Odessa (3 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025600.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Touchstone Resources, LLC60 of 6
Clements Fluids South Texas, Ltd.31 of 3

Districts and work types

DistrictBids
Odessa3
Bryan2
Houston1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-11-126488-59-001HarrisTouchstone Resources, LLC$245,670$248,438+1.1%
2025-04-086481-92-001BrazosTouchstone Resources, LLC$313,200$338,400+8.1%
2025-09-096469-47-001GrimesTouchstone Resources, LLC$508,000$551,200+8.5%
2025-09-096489-98-001MidlandTouchstone Resources, LLC$22,200$24,300+9.5%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2025-11-126488-59-001HarrisMaterial Maintenance Project2 of 2$248,438+1.1%-2.4%
2025-09-096469-47-001GrimesMaterial Maintenance Project2 of 2$551,200+8.5%+47.2%
2025-09-096489-97-001PecosMaterial Maintenance Project3 of 3$29,900+11.6%-0.3%
2025-09-096489-98-001MidlandMaterial Maintenance Project2 of 3$24,300+9.5%-2.8%
2025-09-096489-99-001EctorMaterial Maintenance Project3 of 3$24,000+9.1%-4%
2025-04-086481-92-001BrazosMaterial Maintenance Project2 of 2$338,400+8%+9.2%