Panhandle Sweeping & Maintenance, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: PANHANDLE SWEEPING & MAINTENANCE, LLC · Data as published by TxDOT, lettings Aug 12, 2025 to Aug 20, 2026, retrieved Nov 24, 2026.

Proposals bid
6
Low bids (rank 1)
5
Win rate
83.33%
Low-bid value
$1.6M
Money left on table
$72K
Avg. bid vs. estimate
-12.73%

From Aug 12, 2025 to Aug 20, 2026, Panhandle Sweeping & Maintenance, LLC submitted 6 bids on TxDOT proposals and was the apparent low bidder on 5 of them (83.33%), with low bids totalling $1,606,906. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $71,680 (6.77% of those bids); the median gap was 6.39%. On average its bids came in 12.73% below TxDOT's engineer's estimate. Its most frequent district was Amarillo (6 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20254375.0%$704,992
202622100.0%$901,914

Head-to-head rivals

BidderProposals togetherRanked ahead
Sweeping Corporation of America, LLC33 of 3
J-Men Concrete Construction21 of 2
All Hands & Duke, Inc.11 of 1

Districts and work types

DistrictBids
Amarillo6
Work type of low bidsLow bids
Routine Maintenance Project5

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-08-126488-53-001MooreJ-Men Concrete Construction$226,225$264,230+16.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-08-206507-21-001PotterRoutine Maintenance Project1 of 2$313,527—-7.6%
2026-05-276499-55-001PotterRoutine Maintenance Project1 of 2$588,387—-3.8%
2025-12-106492-17-001CarsonRoutine Maintenance Project1 of 3$156,618—-27.5%
2025-12-106492-18-001PotterRoutine Maintenance Project1 of 1$387,018—-17.3%
2025-09-246490-33-001GrayRoutine Maintenance Project1 of 1$161,356—-12.9%
2025-08-126488-53-001MooreRoutine Maintenance Project2 of 3$264,230+16.8%-7.3%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.