Lone Star Sitework, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: LONE STAR SITEWORK, LLC · Data as published by TxDOT, lettings Nov 7, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
11
Low bids (rank 1)
1
Win rate
9.09%
Low-bid value
$950K
Money left on table
$133K
Avg. bid vs. estimate
-2.15%

From Nov 7, 2024 to Nov 4, 2026, Lone Star Sitework, LLC submitted 11 bids on TxDOT proposals and was the apparent low bidder on 1 of them (9.09%), with low bids totalling $950,337. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $133,497 (14.05% of those bids); the median gap was 14.05%. On average its bids came in 2.15% below TxDOT's engineer's estimate. Its most frequent district was Austin (9 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
2025500.0%$0
20265120.0%$950,337

Head-to-head rivals

BidderProposals togetherRanked ahead
Aaron Concrete Contractors, LLC72 of 7
Dan Williams Company72 of 7
Hunter Industries, Ltd.62 of 6
Dean Word Company, Ltd.52 of 5
Texas Materials Group, Inc.52 of 5
Acme Bridge Company, Inc.40 of 4
Garret Shields Infrastructure43 of 4
Patin Construction LLC33 of 3

Districts and work types

DistrictBids
Austin9
Bryan1
San Antonio1
Work type of low bidsLow bids
Pedestrian, Sidewalks & Curb Ramps1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-02-051755-03-010WilliamsonAaron Concrete Contractors, LLC$2,760,448$2,803,594+1.6%
2026-10-060590-05-057MilamYoko Excavating, LLC$257,450$283,379+10.1%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040285-03-066HaysPedestrian, Sidewalks & Curb Ramps1 of 9$950,337—+1.1%
2026-10-060590-05-057MilamPedestrian, Sidewalks & Curb Ramps2 of 10$283,379+10.1%+20.2%
2026-02-051201-02-026WilliamsonRehabilitation of Existing Road5 of 10$3,915,770+7.3%-7.3%
2026-02-051755-03-010WilliamsonSafety Improvement Projects2 of 9$2,803,594+1.6%-9.3%
2026-01-071197-01-023HaysSafety Improvement Projects6 of 10$1,314,067+31.5%+19.8%
2025-12-030152-03-065CaldwellIntersection & Operational Imprv7 of 7$1,988,056+28.8%-9.1%
2025-11-060805-04-038HaysSafety Improvement Projects7 of 7$2,701,682+35.8%-15.1%
2025-07-020113-05-051BlancoSafety Improvement Projects7 of 7$928,717+52.2%-2.1%
2025-06-050700-03-150TravisIntersection & Operational Imprv4 of 5$2,000,772+22.8%-5.5%
2025-03-040511-02-028ComalSafety Improvement Projects3 of 9$4,085,612+20.5%-17%
2024-11-070805-04-039HaysIntersection & Operational Imprv5 of 7$6,137,127+23.7%+0.5%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.