Hall Brothers, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: HALL BROTHERS, INC. · Data as published by TxDOT, lettings Aug 11, 2026 to Nov 19, 2026, retrieved Nov 24, 2026.

Proposals bid
5
Low bids (rank 1)
2
Win rate
40%
Low-bid value
$505K
Money left on table
$67K
Avg. bid vs. estimate
+9.64%

From Aug 11, 2026 to Nov 19, 2026, Hall Brothers, Inc. submitted 5 bids on TxDOT proposals and was the apparent low bidder on 2 of them (40%), with low bids totalling $505,375. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $67,325 (13.32% of those bids); the median gap was 2.91%. On average its bids came in 9.64% above TxDOT's engineer's estimate. Its most frequent district was Odessa (2 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20265240.0%$505,375

Head-to-head rivals

BidderProposals togetherRanked ahead
Touchstone Resources, LLC21 of 2
L A Fuller & Sons Construction, Ltd.10 of 1
Rk Hall, LLC11 of 1
Southern Sourcing Solutions, LLC10 of 1
Vulcan Construction Materials, LLC10 of 1
Zack Burkett Co.10 of 1

Districts and work types

DistrictBids
Odessa2
Childress1
El Paso1
Paris1
Work type of low bidsLow bids
Material Maintenance Project1
Material Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-10-136509-64-001EctorVulcan Construction Materials, LLC$159,798$196,514+23%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-196508-67-001El PasoMaterial Maintenance Project1 of 2$212,269—-6%
2026-11-106511-98-001ChildressMaterial Maintenance Project3 of 3$136,648+25.2%+21.5%
2026-10-156510-65-001HuntMaterial Maintenance Project - Sealed1 of 2$293,106—-5.9%
2026-10-136509-64-001EctorMaterial Maintenance Project2 of 2$196,514+23%+17%
2026-08-116506-41-001PecosMaterial Maintenance Project3 of 3$130,733+26.9%+21.6%