Elite Contractors and Equipment Ltd: TxDOT Bid Results and Margins

Name as published by TxDOT: ELITE CONTRACTORS AND EQUIPMENT LTD · Data as published by TxDOT, lettings Jan 8, 2025 to Aug 6, 2026, retrieved Nov 24, 2026.

Proposals bid
7
Low bids (rank 1)
1
Win rate
14.29%
Low-bid value
$6.4M
Money left on table
$96K
Avg. bid vs. estimate
+4.95%

From Jan 8, 2025 to Aug 6, 2026, Elite Contractors and Equipment Ltd submitted 7 bids on TxDOT proposals and was the apparent low bidder on 1 of them (14.29%), with low bids totalling $6,391,809. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $95,516 (1.49% of those bids); the median gap was 1.49%. On average its bids came in 4.95% above TxDOT's engineer's estimate. Its most frequent district was Beaumont (7 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025300.0%$0
20264125.0%$6,391,809

Head-to-head rivals

BidderProposals togetherRanked ahead
Isi Contracting, Inc.54 of 5
Ragle Construction, Inc.44 of 4
Texas Materials Group, Inc.32 of 3
Cornerstone Paving and Construction, L.L.C.20 of 2
Grey Sky Construction LLC22 of 2
Hodges and Son Construction Company, Inc.20 of 2
R Construction Civil, LLC20 of 2
Blacksmith Ventures LLC11 of 1

Districts and work types

DistrictBids
Beaumont7
Work type of low bidsLow bids
Intersection & Operational Imprv1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-06-030920-38-287JeffersonR Construction Civil, LLC$3,062,119$3,296,888+7.7%
2025-05-020920-00-171JeffersonCornerstone Paving and Construction, L.L.C.$1,999,855$2,247,695+12.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-08-060920-39-033ChambersBridge Replacement3 of 6$1,960,695+17%+37%
2026-07-010786-01-095JeffersonIntersection & Operational Imprv1 of 4$6,391,809—+5.6%
2026-06-030920-38-287JeffersonBridge Replacement2 of 4$3,296,888+7.7%+2.3%
2026-03-050920-06-040NewtonBridge Replacement4 of 8$1,870,206+25.9%+4.2%
2025-05-020920-00-171JeffersonTransportation Non-Roadway2 of 3$2,247,695+12.4%-14.7%
2025-02-070739-02-183JeffersonRehabilitation of Existing Road3 of 6$4,272,542+38.5%-9.8%
2025-01-080920-12-049JasperBridge Replacement5 of 8$2,051,286+3.6%+10.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.