Name as published by TxDOT: DRAKE ASPHALT LLC · Data as published by TxDOT, lettings Oct 15, 2025 to Oct 15, 2025, retrieved Nov 24, 2026.

Proposals bid
5
Low bids (rank 1)
5
Win rate
100%
Low-bid value
$2M
Money left on table
$49K
Avg. bid vs. estimate
-0.83%

From Oct 15, 2025 to Oct 15, 2025, Drake Asphalt LLC submitted 5 bids on TxDOT proposals and was the apparent low bidder on 5 of them (100%), with low bids totalling $1,967,420. In 5 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $49,180 (2.5% of those bids); the median gap was 2.64%. On average its bids came in 0.83% below TxDOT's engineer's estimate. Its most frequent district was Atlanta (5 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202555100.0%$1,967,420

Head-to-head rivals

BidderProposals togetherRanked ahead
Rk Hall, LLC55 of 5

Districts and work types

DistrictBids
Atlanta5
Work type of low bidsLow bids
Material Maintenance Project5

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2025-10-156490-82-001MorrisMaterial Maintenance Project1 of 2$382,910—+1.6%
2025-10-156490-85-001CassMaterial Maintenance Project1 of 2$403,600—-2.8%
2025-10-156490-87-001TitusMaterial Maintenance Project1 of 2$382,910—+1.6%
2025-10-156490-88-001BowieMaterial Maintenance Project1 of 2$399,000—-3.6%
2025-10-156490-89-001BowieMaterial Maintenance Project1 of 2$399,000—-0.9%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.